Sunday, February 03, 2008

Remodelling update--master bathroom


There is now a door to the bathroom from the bedroom! It fits neatly between the bedroom door and the closet.


The bathroom has been stripped down to the studs: all the badly-placed partly-done tiles removed, the "brand new" (and broken) bath tub removed, the too-wide separating wall narrowed, the sink removed (to make a place for the door). Today the plumber will be here (yes on a Sunday) to work on the pipes. The bathtub being broken is not a bad thing: it's allowed me to rethink the layout. The bathtub will be replaced at a right-angle to the outside wall.


This is the door to the bathroom from the living room. It will be sealed up once all the work in the bathroom has been completed. Right now you almost trip over the toilet when you go through this door--and the windows don't allow much privacy!


This is the sink that's been removed. We'll be reusing it, placing it against the wall that is at the head of the bath.